
Designer/Estimator/CPM Scheduler |
Name : |
William M. Cooke |
Industry Type : |
Engineers |
City & State : |
Concord, CA |
Job Title |
Designer/Estimator/CPM Scheduler |
Relocation Preferences : |
Any |
Objective : |
CAD design, Estimating, CPM scheduling |
Resume : |
|
Professional Employment and Achievements: Consultant 2010 Go Wireless 3075 Citrus Cir., Ste.# 100, Walnut Creek, CA 94598 Sales and support of mobile wireless networks to construction and law firms, contractors, sub-contractors and distributors Value engineering of existing networks, data packs, broadband plans, Designer/Estimator/CPM Scheduler 2007-2008 MTCo. - 1243 Alpine Rd., Design/draft Caltrans/D.O.T. dwgs. during SD, DD & CDs for multiple projects using CAD 2009, 1) Erosion control, sanitary sewer, 3D curbs/gutters, 3D/Iso. ramps, AC/AB/ASB, minor conc., culverts, grading and recognize plan conflict(s) 2) Retaining and sound walls, profiles and super-elevs, drainage, swales, wet and dry utilities, rebar, pavement delineation, traffic handling, staging and signs 3) eBART rail cross section [at] Hwy. 4 for the Sommersville Rd. Interchange project for engineering/mgmnt. review Graphic design: Planimetrics/Geometrics, .Tiff/.Giff/.Jpeg/survey & Aerial/GIS exhibits, clouding and management Micro-station V8 to CAD 2008/LDD translation for the I80 Create, maintain and update project CPM schedules during SD, DD & CDs using Primavera (P3) and Suretrak 2.0 1) Baseline vs. actuals, progress, clear critical path, WBS, trades coord., lag/lead time, float and project look ahead 2) Cost and resource loaded, variance and budget reporting, padding +/- 10%, earned value: BCWS, BCWP and ACWP and forecasts 3) As-Builts with all published A/E/C project updates and changes identifying risk and modeling for future projects Assemble complete Caltrans/D.O.T. BEES codes 1-5, 9-13, 15-17 engineers/consultant OPCC estimate/codes/pricing/vendor relations during pre-con, bidding and construction Complete review of division 1: D.O.T. regs., bonding, subcontractors/quotes, logistics, overhead, contingencies, codes and variables Created and utilized a system of QA/QC and costs reduction between CADD, engineering and mgmnt. aiding budgetary goals Developed and implemented standards for estimated and real-time accurate job/material/labor costing, coding, data and reporting ensuring client approval Created and implemented procedures mitigating risk and securing firm successes against potential claims proceedings and unforeseen project variables Design Tech. 2006 - Avila & Assoc. Consulting Engineers Design/draft Carmel River Bridge [at] Hwy. 1: Planning Study during SD & DD using CAD 2006 1) Conc. [at] road-deck, struct. steel, rebar, expansion joints, MBGR, wet and dry utilities, drainage, signs and as-built conditions 2) Survey data, grading, OG, FG, PC/PS conc. piles, piers and extensions, tubular handrails, stiffeners, plates and anchor bolts 3) Title-blocks, BOMs, plans, layouts, dtls, sections, sketches, elevs, X-refs, sheet set manager, 3D/Iso./Axo. sketches & diagrams CAD Civil 3D: Planimetrics/Geometrics, USGS data, Assist with Caltrans/D.O.T. comments, logs, ODRs and A/E/C team and management coordination via tele-commuting/conferences Assist with and implement procedures mitigating risk and securing firm successes against potential claims proceedings and unforeseen project variables Proj. Engineer/Estimator/CPM Scheduler 2005 Bay Cities Paving & Grading 5029 Forni Dr., Create, maintain and update project CPM schedules using MS Project 2000, Primavera (P3) and Suretrak 2.0 1) Gantt and PERT view timelines, relationships, progress, clear critical path, milestones, histograms and forecasts 2) Baseline vs. actuals, resource loaded and leveling, activity codes, earned value: BCWS, BCWP and ACWP 3) As-Builts including all published field conditions, A/E/C updates, ODRs and published documentation for team/client review Assemble complete Complete review of division 1: bonding, subcontractors/quotes, logistics, overhead, contingencies, codes, labor and material rates and variables Maintain field/office as-builts plans, logs, specs, codes and files during construction and O&Ms including project A/E/C docs, P.C.O. and C.O. validation/back-check Tech. Staff /CPM Scheduler/CAD drafter 2000-2003 S.O.M. One Front St., Ste. #2400, S.F. CA 94111 Const. Admin. 1996-1999 - Michael Willis Architects (JVA) SFIA - New International Terminal (Shoulder. Bldgs.), BART Extension, North Connector Bldg., Parking Garages, Elevated/Internal Roadways, ALRS & Baggage Handling Systems: $1 billion project Additional Computer Knowledge:Arch. Desktop, FTP Sites, Internet Skills/Research, Take-off Digitizers, Excel 7.0, Word 7.0, Outlook (Beginning Level AutoCAD Civil 3D 2012, Autodesk Storm & Sanitary Sewer Analysis 2012, Solidworks, Micro-station V8, Photoshop 4.0) Education/Qualifications: Const. Management Program Diablo Valley College (2006) BA-Intl. Relations/Conflict Resolution San Francisco State Univ. (1994) MST/Titan IV Rocket: Continued knowledge of LEED (Leadership in Energy & Environmental Design); a measurement system for rating buildings on energy efficiency/sustainable design & local/low-impact labor & manuf. during design and construction. Supervisory Experience: (Field/Crew & Office Staff). Conclusion: I am an individual devoted to the challenges of cost(s) management, value engineering and clear design. I offer time management skills, multi-disciplined project experience and desire to advance professionally. Lastly, I believe my involvement, for 30+ years, in valued community/volunteer activities, local San Francisco/Bay Area business development and fund raising, civic/commercial construction projects alongside local sports and music events will aid in firm goals and successes. Intermediate Spanish written/spoken |
|